511 E. John Carpenter Freeway, Suite 600, Irving, TX 75062 - USA
+1 844-733-3828 (1-844-RED-DUCT)
CONTACT US
RED-E-DUCT – 2023RED-E-DUCT – 2023
  • Home
  • Overview
    • Benefits
    • Features
    • Manufacturing & Testing
    • Installing
    • Safety
  • Specifications
    • Designing With RED-E-DUCT
    • Straights
    • Stub Ups
  • Case Studies
    • Case Studies
    • Recent Projects
    • Word From The Trenches
  • Applications
  • Resources
    • Brochures
    • FAQs
    • What Is A Duct Bank?
  • Contact Us
    • General Inquiry
    • Request A Webinar
  • 1-844-733-3828

Setting new standards for innovation and engineering, while building America’s infrastructure.

Home
Product Overview
Specifications
Applications
Recent Projects
Resources

Contact info:
+1 844-733-3828
(1-844-RED-DUCT)
[email protected]

U.S. Patent 20120298244. Other patents pending.
Privacy Policy  |  Terms & Conditions

Setting new standards for innovation and engineering, while building America’s infrastructure.

Contact us at:
+1 844-733-3828
(1-844-RED-DUCT)
[email protected]

vertical_separator_red

Home

Product Overview

Specifications

Recent Projects

Applications

Resources

Contact Us

U.S. Patent 20120298244. Other patents pending.  All rights reserved.  | Privacy Policy  |  Terms & Conditions

  • Contact Us
  • Careers
  • Terms & Conditions
  • Helpful Links
  • Site Map
  • Privacy Policy
© 2022 Forterra. All rights reserved.RED-E-DUCT is a trademark of Forterra.
Find out if RED-E-DUCT is right for your next project

Our RED-E-DUCT engineering and design teams are committed to making sure you get precisely the products you need to design and complete your project exactly as you envisioned.

See what we can do for your project.

Schedule an appointment

1

Power Transmission & Distribution

Duct Bank Installation 

Installed in front of a bank entrance, RED-E-DUCT was used in
conjunction with cast-in-place duct bank to significantly reduce
construction time. Speed of installation reduced the impact to
local businesses.

Power Transmission & Distribution

Duct Bank Installation 

RED-E-DUCT Precast Duct Bank was utilized to reduce overall site construction time. A crew of four was able to install 60 feet of linear duct bank per hour. Horizontal and vertical runs were installed, including precast Stub-Ups containing rigid galvanized conduits.

Industrial Facility

Duct Bank for Fiber and Power Cable

RED-E-DUCT Precast Electrical Duct Bank was used to carry fiber and power cables serving a water treatment plant, significantly reducing the time and cost of installation.

Oil, Gas & Chemical

Duct Bank Infrastructure Under Access Roads   

RED-E-DUCT Precast Duct Banks were installed under and alongside site access roads in multiple locations. RED-E-DUCT became a perfect solution where site conditions required managing a high-water table and rapid installation, ensuring road closures and site disruptions were kept to a minimum.