Scroll Top

INSTALLING

Get On With The Job

RED-E-DUCT is an engineered solution that reduces the time and cost of underground electrical infrastructure. Getting in and out of the ground quickly with RED-E-DUCT saves time, reduces labor, improves safety, minimizes form work, and allows site access to be restored quickly – so you can get on with the job.

160 feet of concrete encased 4Hx4W-6inch Installed in less than 2 minutes
Handling and Installing

RED-E-DUCT is designed to accommodate common handling equipment dependent and sized according to the project requirements.  Heavy or light equipment can be used to quickly place the product in the trench and home the joints.

Depending upon configuration size and type, individual sections weigh from 1,700lbs to 14,000lbs – Products are sized to be within the lifting/swing lengths of common construction equipment.

RED-E-DUCT patented joint system allows for fast reliable joint engagement and a variety of methods can be safely and quickly used to home the joints. 

Electric Winch or Come-along

Two part sling

Skid steer – Push it home

Just in time delivery or on-site storage

Arriving at the site ready for installation, RED-E-DUCT offers superior economics and performance in a wide range of underground applications. This unique precast electrical duct bank system provides for rapid installation speed and unsurpassed structural integrity.

The RED-E-DUCT system delivers numerous advantages on the job site, including fewer part numbers in inventory, combined with the flexibility to install any pieces anywhere on the job site where the designated standard is defined. The system allows contractors to quickly adapt to new installation priorities with no delay.

RED-E-DUCT On-site Support

Our field service representatives are available to assist your site teams with job-site planning, receiving, handling, and installation procedures.

Schedule an appointment

1

Power Transmission & Distribution

Duct Bank Installation 

Installed in front of a bank entrance, RED-E-DUCT was used in
conjunction with cast-in-place duct bank to significantly reduce
construction time. Speed of installation reduced the impact to
local businesses.

Power Transmission & Distribution

Duct Bank Installation 

RED-E-DUCT Precast Duct Bank was utilized to reduce overall site construction time. A crew of four was able to install 60 feet of linear duct bank per hour. Horizontal and vertical runs were installed, including precast Stub-Ups containing rigid galvanized conduits.

Industrial Facility

Duct Bank for Fiber and Power Cable

RED-E-DUCT Precast Electrical Duct Bank was used to carry fiber and power cables serving a water treatment plant, significantly reducing the time and cost of installation.

Oil, Gas & Chemical

Duct Bank Infrastructure Under Access Roads   

RED-E-DUCT Precast Duct Banks were installed under and alongside site access roads in multiple locations. RED-E-DUCT became a perfect solution where site conditions required managing a high-water table and rapid installation, ensuring road closures and site disruptions were kept to a minimum.